Skip to main content
Clear Pathways

TECHNOLOGY CONSULTING

Work out what is wrong. Then fix the right thing.

We are a technology consultancy. Most engagements start by establishing what is actually causing the problem — which is often not what it was assumed to be — and end with your team able to run what we built without us.

Four questions, two minutes, no email address. You get a written starting point either way.

START HEREWhere you areExploreWhich directions suit what I haveDevelopWhat to get better at, and whyTransitionWhat carries into different work

WHY TEAMS CALL US

The hard part is rarely the building. It is knowing which thing to build.

Most engagements start in one of three places, and none of them is a failure of the team that got there.

Nobody can say what is wrong

It is slower and more expensive than it was, and every explanation on offer is a hypothesis nobody has measured.

The team is at capacity

You know roughly what needs doing. There is nobody free to do it, and hiring for it would take two quarters.

The stakes make it hard to start

The system cannot go down, the data is regulated, or the deadline is external — so the safe move keeps being to wait.

HOW WE WORK

Measure first. Scope small. Hand it back.

None of this is novel, and that is rather the point: the projects that go wrong usually skipped the first step and found out the cost in month four.

  1. 01Measure what is actually happening before anyone proposes a plan.
  2. 02Scope the smallest change that solves the real problem.
  3. 03Build it in slices that each work, and that each roll back.
  4. 04Work in your repo, with your engineers, not in a room next door.
  5. 05Hand it over so your team can take the next change alone.
01020304Everything that feels possibleA sequence you can start today

FOUR STARTING POINTS

Where engagements usually begin.

Pick whichever is closest. They overlap more than they look — a cost problem and a reliability problem are frequently the same problem.

START 01 / DIAGNOSE

Something is wrong

The system is slow, expensive or fragile, and nobody can tell you why.

Before anyone proposes a rebuild, it is worth knowing what is actually causing the pain. Usually it is two or three things, and usually they are not the ones being blamed.

  • Architecture and infrastructure review
  • Where the money and the latency actually go
  • Failure patterns and what keeps causing them
  • A ranked list of fixes with effort against impact
Cloud and infrastructure

START 02 / BUILD

Build something new

You need software that does not exist yet, and no team free to build it.

Getting a first version in front of real users quickly, built so the second version does not mean starting again.

  • Scoping down to a version worth shipping
  • Architecture decisions you can live with
  • Delivery alongside your own engineers
  • Handover that does not depend on us staying
Custom software

START 03 / CLARIFY

Make sense of the data

Two reports disagree, and the argument about which is right keeps winning.

Getting to numbers people stop arguing about, then deciding whether anything more sophisticated is actually worth building.

  • Where your numbers come from and why they differ
  • A warehouse and modelling layer that fits your size
  • Metrics defined once, used everywhere
  • An honest read on which AI ideas are worth it
Data and AI

START 04 / PROVE

Pass the audit

A customer, an investor or a regulator wants evidence, and soon.

Closing the gap between how you actually operate and what an auditor needs to see, without turning the company into a paperwork exercise.

  • Gap assessment against the standard you need
  • Fixing the findings that matter first
  • Controls that fit how your team already works
  • Evidence collection that keeps running after we go
Security and compliance

A USEFUL FIRST MOVE

Something you could do this week, without hiring anybody.

Pick the statement closest to your situation. The suggestion is what we would tell you on a first call.

CLOSEST TO YOUR SITUATION

SUGGESTED NEXT STEP

Start by measuring, not rebuilding

Turn on cost attribution and tracing and give it a week. The cause is usually two or three specific things, and they are usually not the ones being blamed in the meeting.

An orientation tool, not an assessment. It applies a short set of fixed rules to what you selected — nothing more.

THE ENGAGEMENT

Assess, scope, deliver, hand over.

Four stages. The first is short and paid, and it ends in a document you own whether or not you go further.

  1. 01

    Assess

    A short, paid piece of work that establishes what is actually happening, before anybody commits to a plan.

  2. 02

    Scope

    The smallest change that solves the real problem, written down with what it costs and what it does not include.

  3. 03

    Deliver

    Built in increments you can see, alongside your engineers rather than in a room they have no access to.

  4. 04

    Hand over

    Documentation, a walkthrough, and a team that can run it without us. We would rather be re-hired than depended on.

ENGAGEMENT CANVAS

What a plan looks like once it has been broken down.

An illustrative engagement, chosen because it is common. Each step is reversible on its own, which is what keeps a bad week from becoming a bad quarter.

ILLUSTRATIVE SCENARIO

Getting a nine-year-old monolith onto managed infrastructure

An illustrative engagement, not a client case study. Real ones diverge by the second week.

  1. 1

    Find out what the system actually does

    COVERED

    Including the three cron jobs nobody has owned since the person who wrote them left.

  2. 2

    Measure where cost and latency really go

    COVERED

    It is rarely the part everyone complains about. Usually it is one query and one oversized instance.

  3. 3

    Decide what moves, what gets rewritten, what dies

    YOU ARE HERE

    Most of it moves as-is. Rewriting during a migration is how migrations fail.

  4. 4

    Move the least risky service first

    Proves the pipeline, the monitoring and the rollback while the stakes are still low.

    • EITHERLift and shift first, optimise after
    • EITHERRe-platform the service while it moves
  5. 5

    Migrate the rest in slices

    Each slice reversible on its own, so a bad week never becomes a bad quarter.

  6. 6

    Hand over the runbook and the on-call

    The engagement ends when your team can do the next one without us.

WHAT SHAPES THE WORK

The right answer depends on things a reference architecture cannot know.

These go into the plan at the start rather than being discovered in week six, where they stop being inputs and become overruns.

The stack you already have

We work with what is there. Recommending a rewrite to something we prefer is not advice, it is a preference.

What has to keep running

Most of this work happens on systems that cannot go down. That constrains the plan more than any technical choice.

Who is on your team

The right architecture for ten engineers is the wrong one for two. Capacity is a design input, not a detail.

Budget and deadline

Both are real. A plan that only works if neither moves is not a plan worth having.

Compliance and risk

Regulated data, audit deadlines and contractual obligations change what is possible, so they go in at the start.

What happens after we leave

Everything is built to be operated by your team. If it needs us to keep running, we built it wrong.

ENGAGEMENT MODELS

Different shapes, depending on what you need.

Most clients start with an assessment and then pick one of the others. Some only ever want the assessment, which is a legitimate outcome.

Start with an assessment

Clear Pathways publishes no client names, logos, case studies or results. Where relevant experience exists, ask and you will get a straight answer directly.

Assessment
Two to four weeks, fixed price, ending in a written findings document you own whether or not you hire us again.
Project delivery
A defined piece of work with a scope, a price and an end date, delivered in increments you can see.
Embedded engineers
Our people inside your team, in your standups and your repo, for a fixed period.
Fractional architecture
A few days a month of senior technical judgement for teams too small to justify hiring it.
Audit readiness
Gap assessment through to evidence collection, aimed at a specific standard and a specific date.
Handover and training
Documentation, pairing and walkthroughs so the thing we built stops being ours.

WRITING

What we think, before you have to pay to find out.

Practical pieces on the decisions that tend to go wrong, including the ones where our advice is to do less.

SOFTWARE DELIVERY

When to rewrite, and when not to

Rewrites are chosen for how the code feels to work in, and justified afterwards with business reasons.

21 August 2026 · 2 min read

QUESTIONS

The things people ask on a first call.

Including what we will not promise. The full list covers more.

What does Clear Pathways actually do?

Technology consulting across four areas: cloud and infrastructure, data and AI, custom software, and security and compliance. In practice most engagements start with working out what is really causing the problem, because that is frequently not what it was assumed to be.

How does an engagement usually start?

With a short, paid assessment — typically two to four weeks — ending in a written document covering what we found and what we would do about it. You own that document whether or not you hire us for the work it recommends.

Do you work with small companies or only large ones?

Both. The work differs more than the size suggests: smaller teams usually need judgement and capacity, larger ones usually need someone without a stake in the existing internal argument.

Will you tell us not to do something?

Regularly. A good share of assessments conclude that the proposed project is not the right one, or that the problem is a configuration change rather than a quarter of engineering. That is a more useful outcome than a confirmed scope.

Who owns the code and the documents?

You do, from the first commit, in your repository and your accounts. Nothing we build lives somewhere you cannot reach, and nothing requires us to keep it running.

What happens when the engagement ends?

Handover is part of the scope rather than a courtesy at the end: documentation, a walkthrough, and your team making changes unaided before we leave. We would rather be re-hired for the next thing than depended on for this one.

You do not have to figure it all out today.

Start with where you are. Explore what is possible. Choose one step you can take next.